Durable Plastic Pallet Moulding for Streamlined Logistics

Product Details
Customization: Available
Surface Finish Process: Polishing
Mould Cavity: Single Cavity
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9000
Terms of Payment
LC, T/T, PayPal, Western Union
  • Durable Plastic Pallet Moulding for Streamlined Logistics
  • Durable Plastic Pallet Moulding for Streamlined Logistics
  • Durable Plastic Pallet Moulding for Streamlined Logistics
Find Similar Products

Basic Info.

Application
Household Appliances, Furniture, Home Use
Runner
Cold Runner
Design Software
UG
Standard
Lkm.Hasco.Dme
Customized
Customized
Name
Logistics Use Plastic Pallet Moulding
Cavity
1 Cavity
Design
3D or 2D
Runner Type
Hot Runner
Mould Steel
P20h/718/2738etc
Mould Base
Lkm.Hasco.Dme
Mould Life
500.000~1million Shots
Sample Time
50 Days
Style
Single Deck,Double Deck
Color
Manycolors Are Avaliables
Transport Package
Wooden Case
Trademark
JTPmould
Origin
Taizhou, Zhejiang, China
HS Code
8480719090
Production Capacity
160 Sets/Per Year

Product Description

1.Product Description

Specification

1.Professional Newest Design
2. Competitive price, high quality.
3. Long Life.
 
Product Name Logistics Use plastic pallet moulding 
Mould Steel P20H,718H,2738H,S136,H13 etc.
Product Material PP,HDPE,LDPE etc.
Mould Base LKM,ISM,HASCO,DME
Cavity Single/Multi-cavity
Mould life 500,000 ~1million shots
runner type cold/hot runner
Delivery time 30~60day
 
The main Mold Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40


Durable Plastic Pallet Moulding for Streamlined Logistics





2. Our Company

Durable Plastic Pallet Moulding for Streamlined Logistics





3. Our Sample

Durable Plastic Pallet Moulding for Streamlined Logistics




4. Our Exhibiton

Durable Plastic Pallet Moulding for Streamlined Logistics


5. Production Process

Durable Plastic Pallet Moulding for Streamlined Logistics
Durable Plastic Pallet Moulding for Streamlined Logistics


FAQ

Q: 1 Are you trading company or manufacturer ?


A: We are factory.
 

Q: 2 Where is your factory located?


A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 15 minutes from train station to our factory.
 

Q: 3. How to go to your factory?


A: You can come to our city by flight, bus or train.
It takes 2 hours by flight from Guangzhou to our city.
It takes 3.5 hours by train from Shanghai to our city.
It takes 1 hour by bullet train from Ningbo to our city. 
 

Q: 4.How about quality control in your factory?


A: We believe "Quality is above everything". We have professional team to control the quality. Our QC team mainly do the following procedures:
      A) Design Optimize control 
      B) Mould steel hardness Inspection
      C) Mould assembly Inspection
      D) Mould trial report and samples Inspection
    E) Final inspection for mould & packing before shipmentIf you have another question, pls feel free to contact us as below:
 

Q:5. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?


A:Yes. 
      DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models - This can save time and money in producing your parts.

Q: 6. What type of plastic material is best for my design/component?


A: Plastic Materials selection depends on the application of your product. We will give you some suggestion after we checked the function of your component. And we can make the mould trial with different material according to your requirement.

Q: 7. What kind of mould can you make?


A:  We can make all kinds of plastic injection moulds and blow moulds.
     We can suggest you the proper cavity number as per your injection machines sizes.
 

Q:8. What's your payment method?


A: By T/T, L/C, Trade Assurance, Western Union.

Q:9. How long of your mould delivery time?


A:  It takes 6-10 weeks to have the mould manufactured depending on the mould structure and the number of cavity (single or multi) after you approved our mould drawing. The delivery time should be calculated from the date you approved our mould drawing. We can ship your plastic moulds with 1 week after you confirmed our final samples.

Welcome everyone to visit JTP MOULD, It's our pleasure to know everyone. 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier