2020 Newly High Quality Plastic Electronical Box Mould

  • Audited Supplier
  • 13 yrs

Contact Supplier

Product Highlights

  • Diverse Mould Steel Options: Available in P20H, 718H, 2738H, S136, H13, and other high-grade steels.
  • Long Mould Life: Designed for 500,000 to 1 million shots depending on steel grade.
  • Customizable Cavity Configurations: Offer single or multi-cavity options based on production needs.
  • Flexible Runner Systems: Support both cold runner and hot runner types for various applications.
  • Wide Material Compatibility: Suitable for PP, HDPE, LDPE, and other plastic materials.
  • Standard Mould Bases: Compatible with LKM, HASCO, DME, and ISM standard bases.
  • Fast Sample Production: Sample time typically takes around 50 days for new designs.
  • Professional Quality Control: Comprehensive QC covering design, hardness, assembly, and final inspection.

Product Images of 2020 Newly High Quality Plastic Electronical Box Mould

2020 Newly High Quality Plastic Electronical Box Mould
2020 Newly High Quality Plastic Electronical Box Mould pictures & photos
2020 Newly High Quality Plastic Electronical Box Mould
2020 Newly High Quality Plastic Electronical Box Mould pictures & photos
2020 Newly High Quality Plastic Electronical Box Mould
2020 Newly High Quality Plastic Electronical Box Mould pictures & photos
2020 Newly High Quality Plastic Electronical Box Mould
2020 Newly High Quality Plastic Electronical Box Mould pictures & photos
2020 Newly High Quality Plastic Electronical Box Mould
  • 2020 Newly High Quality Plastic Electronical Box Mould
  • 2020 Newly High Quality Plastic Electronical Box Mould
    2020 Newly High Quality Plastic Electronical Box Mould
  • 2020 Newly High Quality Plastic Electronical Box Mould
    2020 Newly High Quality Plastic Electronical Box Mould
  • 2020 Newly High Quality Plastic Electronical Box Mould
    2020 Newly High Quality Plastic Electronical Box Mould
  • 2020 Newly High Quality Plastic Electronical Box Mould
    2020 Newly High Quality Plastic Electronical Box Mould

Find Similar Products

Product Description

1.Product Description

Specification

1.Professional Newest Design
2.Competitive price, high quality.
3.Long Life.
 

Product Name 2020 Newly High Quality Plastic Electronical Box Mould
Mould Steel P20H, 718H, 2738H, S136, H13, etc.
Product Material PP, HDPE, LDPE, etc.
Mould Base LKM, ISM, HASCO, DME
Cavity Single/Multi-cavity
Mould life 500,000 ~1 million shots
runner type cold/hot runner
Delivery time 30~60 days
 
The main Mold Steel and Hardness for you reference:
Steel Grade S50C P20 P20HH 718H 2738H H13 S136 NAK80
Hardness(HRC) 17-22 27-30 33-37 33-38 36-40 45-52 48~52 34-40


2020 Newly High Quality Plastic Electronical Box Mould






2. Our Company

2020 Newly High Quality Plastic Electronical Box Mould





3. Our Sample

2020 Newly High Quality Plastic Electronical Box Mould




4. Our Exhibiton

2020 Newly High Quality Plastic Electronical Box Mould


5. Production Process

2020 Newly High Quality Plastic Electronical Box Mould
2020 Newly High Quality Plastic Electronical Box Mould


FAQ

Q: 1 Are you trading company or manufacturer ?


A: We are factory.
 

Q: 2 Where is your factory located?


A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 15 minutes from train station to our factory.
 

Q: 3. How to go to your factory?


A: You can come to our city by flight, bus or train.
It takes 2 hours by flight from Guangzhou to our city.
It takes 3.5 hours by train from Shanghai to our city.
It takes 1 hour by bullet train from Ningbo to our city. 
 

Q: 4.How about quality control in your factory?


A: We believe "Quality is above everything". We have professional team to control the quality. Our QC team mainly do the following procedures:
      A) Design Optimize control 
      B) Mould steel hardness Inspection
      C) Mould assembly Inspection
      D) Mould trial report and samples Inspection
    E) Final inspection for mould & packing before shipmentIf you have another question, pls feel free to contact us as below:
 

Q:5. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?


A:Yes. 
      DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models - This can save time and money in producing your parts.

Q: 6. What type of plastic material is best for my design/component?


A: Plastic Materials selection depends on the application of your product. We will give you some suggestion after we checked the function of your component. And we can make the mould trial with different material according to your requirement.

Q: 7. What kind of mould can you make?


A:  We can make all kinds of plastic injection moulds and blow moulds.
     We can suggest you the proper cavity number as per your injection machines sizes.
 

Q:8. What's your payment method?


A: By T/T, L/C, Trade Assurance, Western Union.

Q:9. How long of your mould delivery time?


A:  It takes 6-10 weeks to have the mould manufactured depending on the mould structure and the number of cavity (single or multi) after you approved our mould drawing. The delivery time should be calculated from the date you approved our mould drawing. We can ship your plastic moulds with 1 week after you confirmed our final samples.

Welcome everyone to visit JTP MOULD, It's our pleasure to know everyone. 

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR2231295". Items marked "verified" are certified.

Watch Video
Watch Video
Taizhou Huangyan JTP Mould Co., Ltd.
Taizhou Huangyan JTP Mould Co., Ltd.
Taizhou Huangyan JTP Mould Co., Ltd.
Taizhou Huangyan JTP Mould Co., Ltd.
Taizhou Huangyan JTP Mould Co., Ltd.
Taizhou Huangyan JTP Mould Co., Ltd.
Taizhou Huangyan JTP Mould Co., Ltd.
Taizhou Huangyan JTP Mould Co., Ltd.

About Our Factory & Business Background

Address
No. 16 Huimin Road, Northern Industrial Zone, Huangyan, Taizhou, Zhejiang, China
Terms of Payment
LC, T/T, PayPal, Western Union
International Commercial Terms(Incoterms)
FOB, CFR, CIF, DDP, EXW
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Nearest Port
NingBo, Shanghai

Our Production Capability & Technical Expertise

Main Products
Plastic Mould, Plastic Mold, Plastic Crate Mould, Injection Mold, Mould, Mold, Plastic Injection Mold, Plastic Injection Mould, Household Mould, Plastic Basket Mould

Our Industry Experience & Global Business Record

Export Year
2011-01-06
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

Are you a trading company or manufacturer?
We are a factory.
Where is your factory located?
Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China. It is one hour from Taizhou airport by car and 15 minutes from the train station.
How can I travel to your factory?
You can arrive by flight, bus, or train. It takes 2 hours by flight from Guangzhou, 3.5 hours by train from Shanghai, and 1 hour by bullet train from Ningbo.
What is your quality control process?
We prioritize quality with a professional team. Procedures include design optimization, mould steel hardness inspection, assembly inspection, mould trial report and sample inspection, and final inspection before shipment.
Can you quote and make moulds based on 3D drawings?
Yes. We accept DWG, DXF, STEP, IGS, and X_T files to quote prices and manufacture moulds according to your models, saving time and money.
What type of plastic material is best for my design?
Material selection depends on the product application. We provide suggestions after checking the component function and can conduct mould trials with different materials as required.
What kinds of moulds can you manufacture?
We produce all kinds of plastic injection moulds and blow moulds, and can suggest the proper cavity number based on your injection machine sizes.
What are your payment methods?
We accept T/T, L/C, Trade Assurance, and Western Union.
How long is the mould delivery time?
Manufacturing takes 6-10 weeks depending on the mould structure and cavity count after drawing approval. Shipping occurs 1 week after final sample confirmation.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now